On Going Projects

On Going Projects of the Company -

S.No.

Name of the Employer   Name, Location and Nature of Work Contract Price (Rs. in Crores)
1. MADHYA PRADESH ROAD DEVELOPMENT CORPORATION  BHOPAL THROUGH KALYAN TOLL INFRASTRUCTURE LIMITED Rehabilitation & Up-gradation of Kannod - Satwas -Punasa Road Section of SH-41 from Chainage Km. 0+000 to km.77+330 (Design length 77 + 320 km.) to two lane Cement Concrete pavement with hard /paved shoulder in the state of Madhya Pradesh 84.77
2. MADHYA PRADESH URBAN DEVELOPMENT COMPANY LIMITED Improvement of Water Supply in Betma, Gautampura and Depalpur Package No. MPUSIP 2A 36.70
3. MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY, PIU SEHORE Construction of Rural Road / CDs  Works under UP gradation including Maintenance for five years after construction. –; Package No. MP MR-3502(UPG) 27.23
4. PUBLIC WORKS DEPARTMENT BRIDGE CONSTRUCTION DIVISION , INDORE Construction of submersible bridge across tapti river on manjrodkaladaryapur (nayakheda) road 12.94
5. PUBLIC WORKS DEPARTMENT BRIDGE CONSTRUCTION DIVISION , BHOPAL Construction of 3 bridges at ch. 3100 m, 4550 m, 5910 m in sehore town on soyachopal- housingboard colony road distt. Sehore 4.98
6. MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY, PIU DHAR-3 Construction / Up-gradation of roads / CDs / Bridges including Maintenance for five years after construction. –; Package No. MP11WB13 5.20
7. MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY, PIU DHAR-3 Construction of Bridges under Pardhan Mantri Gram Sadak Yojna including Maintenance for five years after construction.Package No. 774_MP11-BR-110_Dhar_Dhar-3 4.81
8. PUBLIC HEALTH ENGINEERING DEPARTMENT., MUSAKHEDI, INDORE Survey, Investigation, Design and Construction of Piped Water Supply Scheme at Village - Pigdamber, Block - Mhow, Distt.- Indore 1.33

Order Book – Details of our Project -

Sr No.

Project Description Client State Total Project Value

Project Start Date

1 Rehabilitation & Up-gradation of Existing Highway to 2 Lane /4 Lane with paved shoulder Configuration from Kusumba to Malegaon (Ch. Km. 54+155 to Km. 95+500) section of NH -160H (Malegaon – Sahada) on EPC Mode in the State of Maharashtra Sublet Work Through B.R. Goyal Infrastructure Pvt. Ltd. Maharashtra Rs. 8300 Lakh Project yet to be started
2 Collection of user fee through fee collecting agency on the basis of competitive bidding on e-tender basis for Kelapur Fee Plaza located at km 150.00 for the section from km 123.00 to km 153.00 (Devdhari-Kelapur Section) of Nagpur-Hyderbad Section of NH-7 in the state of Maharashtra. ( Allotted in the name of Consortium – highway and Tandon Tollways and  company having 51% sharing in the project.) NHAI Maharashtra RS. 1977.77 Lakhs Project yet to be started
3 Construction of Semda Kanwan Bidwal Road to Shergarh Barmandal Road Total Length 7.370 Km. PWD Division, Dhar Madhya Pradesh Rs. 539.76 Lakhs Project yet to be started